Selasa, 25 Oktober 2011

Open Studio last weekend

Thanks to everyone who stopped in to visit at the Open Studio tour last weekend :)
I had a great time showing everyone around my little world & chatting about projects...even met a few of my neighbors, lol :)
I'll definitely be on the tour again next year: we'll see if I'm still in the same spot... ; )

Amber

Kamis, 13 Oktober 2011

Open Studio This Weekend


My little shop will be open this weekend--Saturday & Sunday from noon till 6; stop in & say hi :)
Maps of all the artist studios on the tour are in the Boise Weekly or you can download one here:


Look for the BOSCO sign out on the road.
Hope to see ya here :)

Amber

Senin, 10 Oktober 2011

Trucks, Mud, & Sticky Situations....

Soooo, my grand accomplishment yesterday was getting the Mack-Truck stuck in the mud...granted its been raining like crazy & I knew I was risking it...lol, but it was sunny & forecast for more rain the next day, so I decided to go for it...
I wanted to pick up the chicken-house/shed & move it to clean up with the tractor, & then put the shed back into place on some concrete slabs that I have been saving...  Yeah, it didn't quite go that way....
After gathering up the big spreader-bar & all the cables & shackles & rigging everything up, the little crane just wouldn't lift it....so, I thought: hmmm, need to be closer (the closer you are, the more the crane can lift).  Soooo, I unhooked everything & moved the crane; as I was creeping into place, I noticed that I was slipping sideways...not a good sign...but, I was closer, so thought I would give it another try....  And....same result...by this time, I had called in my mother (encase I needed to be pulled out of the mud).  We looked at the shed, & the crane, & thought---there is no way that shed is too heavy...maybe we need hydraulic fluid...  So, I lugged over a 5 gallon bucket (you can buy them at Costco, btw--last time I bought 3 big buckets & 2 bottles of champagne--I got weird looks at the checkout) anyway, the crane was thirsty, & I added probably 2.5 gallons of oil (I think about 1/3 of it ended up on me or in my hair)  & we gave it another try....   No luck, grrrrrr....I think there is something wrong with the main cylindar: shall be calling ICS to check it out...   And I go to move the truck: stuck in to mud, of course...we try putting stuff under the tires, back & forth, cursing, laughing, & looking.  Finally, we gave it up & helped ourselves to grandpa's whiskey stash (they are not home, lol) & toasted to a failed endeavor...lol :)

Today, I did get it unstuck just before the rain started again...  but the chicken house is still in the same spot, lol.  For now, I have decided to just go with it... maybe next spring it will get moved, lol, maybe not...
btw: this is what I looked like before we started playing in the mud...ah, the life of glamour....lol

Open Studio this weekend; hope to see you here :)

Amber

Selasa, 04 Oktober 2011

Boise Open Studios Tour

For the first time ever, I am very excited to be a part of the Boise Open Studios Tour....
My little metal shop will be open Saturday & Sunday: the 15th & 16th from noon till 6: stop in anytime & say hi : )
I will have snacks & drinks on hand; & will be doing tours of the shop, property, & artwork...
Download maps & artist info here:
Hope to see you here :)
---Amber----

Senin, 26 September 2011

Hobble Creek Park: Install

We installed "Zephyrus" last week at Hobble Creek Park....
A 28' tall weather vane, we loaded the base & sculptural piece on the Mac-truck & drove it into Boise from Star....Blake Trailers did the heavy fabrication: they made everything look exactly like I had pictured in the beginning (over a  year ago)
The base is a recycled stand from Idaho Power, & the weather vane is made from salvaged steel, left-over copper from another project, stainless steel that I managed to convince ISE Cranes to let me have (for a price), & the spinning part on the top came from a very special friend :) 
once the base was in place, the weather vane was lifted into place...
Montry & I guided in into place....
when it came to torque-ing down the bolts, I let Jeff take over...lol
Jeff & Montry took care of the mounting bolts...
And in about an hour's time, it was done!
The plaque with the story of the design will go on later, along with the directional signage, but I'm so happy to see the piece in place!  It moves with the wind so easily, & the top spinner goes around with the slightest breeze:
 thanks Mike-E : )  It's perfect!

Will update when I get the signage up; for now, I'm so happy with this one: it looks so amazing in person; even better than the plans!  Definitely a contrast for baseball fields, but I think it works :) 

Amber



Selasa, 13 September 2011

Hobble Creek Park: update

The next project to be installed: a 28' tall weather vane...inspired by sailing ships & daydreams....

 Steel with copper & stainless accents...
 & lots of rivets & bolts :)
This one will be installed next week: maybe Tuesday; I get back from Minneapolis & the Creative Connection on Sunday evening; so maybe Monday, but probably Tuesday, lol : )

for a look at the original proposal, click here: http://www.refinerii.com/2010/06/hobble-creek-park-project-approved.html

amber

Senin, 12 September 2011

Kleiner Park Install; new pics :)

some new pics from the install....just got them :)
enjoy...












lol; the last one cracks me up...

next week; Hobble Creek Park, & the Creative Connection on Minneapolis...flying out on Wednesday: wish me luck!

Amber